§ 16-47. Standby power.
Latest version.
The cable system operator shall maintain equipment capable of providing standby powering for head end transportation and trunk amplifiers for a minimum of two hours. All utility safety regulations must be followed to prevent a standby generator from powering the dead utility line, with possible injury to an unwitting lineman.
(Code 1985, § 4-430; Ord. of 4-6-1981)